Electric Boilers
Electric boilers are selected for apartments without gas connection, for houses with limited utility space, and for commercial properties that need stable daytime heating. In Chisinau and across Moldova, practical selection starts from real heat loss and available electrical capacity.
Before installation, teams verify allocated power, electrical protection layout, cable section, hydraulic scheme, and service access. Wrong selection often leads to overload and repeated startup adjustments.
The practical workflow is calculation, installation validation, fitting, startup checks, and maintenance planning.
When electric boiler setup is the right fit
This category is relevant where gas is unavailable or where a compact, controllable heating setup is required.
What drives model selection
Key factors are heat loss, incoming power limit, automation level, hot-water profile, and electrical safety constraints.
Installation, startup, and stable operation
Before works begin, connection scheme and protection elements are fixed. After fitting, startup is validated in real operating modes and service terms are aligned.
What else matters in selection
For parent-level equipment choice, teams usually start from boilers, then narrow down to electric models. If gas supply is available, they compare gas boilers against the same operating profile. For autonomous fuel scenarios, projects also review solid fuel boilers as an alternative. For turnkey rollout, execution is coordinated through boiler installation with startup verification.
Frequently asked questions
What sites are electric boilers suitable for?
For apartments, houses, and commercial sites that need stable heating without gas connection.
What is checked before installation?
Heat loss, available power, protection layout, hydraulic scheme, and service access.
Can installation and startup be delivered in one project?
Yes, selection, fitting, and commissioning can be coordinated in one workflow.
How can overload risk be reduced?
By accurate sizing and electrical infrastructure checks before fitting.
Is service available after startup?
Yes, maintenance terms are fixed when project conditions are confirmed.