We sell, deliver and install climate control equipment throughout the Republic of Moldova

Solid Fuel Boilers

Commercial selection for projects where heating autonomy and stable seasonal operation matter.
Price
from
lei
up to
lei
Brand
Power, kW
Heating surface, m²
Loading type
Sorting:
Power, kW
15,0
Heating surface, m²
150
Loading type
Automatic
97 900 lei
77 705 lei
prod installation It is possible to order with installation
Solid fuel boiler with manual loading Candle Uni 70 kW
Power, kW
70,0
Heating surface, m²
700
Loading type
Manual
85 980 lei
78 164 lei
prod installation It is possible to order with installation
Solid fuel boiler LOGITERM drevoMAX 50 kW
Power, kW
50,0
Heating surface, m²
400
Loading type
Manual
85 986 lei
78 169 lei
prod installation It is possible to order with installation
Solid fuel boiler Stalmark EKO Pioner 25 Kw
Power, kW
25,0
Heating surface, m²
250
Loading type
Automatic
87 251 lei
79 319 lei
Power, kW
9,0
Heating surface, m²
90
Loading type
Automatic
92 400 lei
81 500 lei
Power, kW
20,0
Heating surface, m²
200
Loading type
Automatic
102 960 lei
81 745 lei
Power, kW
12,0
Heating surface, m²
120
Loading type
Automatic
95 546 lei
84 241 lei
Power, kW
17,0
Heating surface, m²
170
Loading type
Automatic
97 900 lei
86 296 lei
Power, kW
16,0
Heating surface, m²
160
Loading type
Automatic
102 300 lei
86 499 lei
Power, kW
15,0
Heating surface, m²
150
Loading type
Automatic
98 296 lei
86 675 lei
Power, kW
25,0
Heating surface, m²
250
Loading type
Automatic
113 025 lei
89 740 lei
Power, kW
20,0
Heating surface, m²
200
Loading type
Automatic
103 774 lei
91 540 lei
Power, kW
21,0
Heating surface, m²
210
Loading type
Automatic
104 693 lei
92 311 lei
Power, kW
30,0
Heating surface, m²
300
Loading type
Automatic
118 580 lei
94 146 lei
Power, kW
25,0
Heating surface, m²
250
Loading type
Automatic
107 800 lei
95 010 lei
Power, kW
15,0
Heating surface, m²
150
Loading type
Automatic
109 120 lei
96 249 lei
Shown from 80 by 96 from 117 results

Solid fuel boilers are selected for houses with long winter cycles, for workshops and storage sites that need autonomous heating, and for commercial properties where gas dependency should be minimized. In Chisinau and across Moldova, effective selection starts from real heat loss, available fuel format, and actual boiler room constraints.

Before installation, teams validate chimney setup, ventilation, hydraulic layout, safety clearances, and service access. Wrong sizing or wrong setup often results in unstable heating and higher fuel consumption during peak season.

The practical workflow is load calculation, installation validation, fitting, startup checks, and maintenance planning.

 

When this category is the right fit

This page is used for projects where heating autonomy is a priority and fuel logistics can be maintained throughout the cold season.

 

What drives model selection

Key factors are heat loss, fuel type, chimney parameters, buffer volume, and loading cycle profile. For intensive operation, service routine is planned from the beginning.

 

Installation, startup, and stable operation

Before works begin, connection scheme and safety nodes are fixed, then startup is tested in real operating modes. Service terms are aligned at project confirmation stage.

 

What else matters in selection

For parent-level comparison across boiler formats, teams usually start from boilers. Where stable gas supply exists, they compare gas boilers for automated daily control. If electrical infrastructure is suitable, they also assess electric boilers as compact alternatives. For turnkey rollout, execution is coordinated through boiler installation with startup verification.

 

Frequently asked questions

What sites are solid fuel boilers suitable for?
For houses and commercial sites where heating autonomy is required through the season.

What is checked before installation?
Heat loss, chimney and ventilation setup, hydraulics, safety clearances, and service access.

Can installation and startup be delivered in one project?
Yes, selection, fitting, and commissioning can be coordinated in one workflow.

How can fuel overuse risk be reduced?
By accurate load-based sizing and operating-profile setup based on real usage.

Is service available after startup?
Yes, service terms are fixed when project conditions are confirmed.