We sell, deliver and install climate control equipment throughout the Republic of Moldova

Solid Fuel Boilers

Commercial selection for projects where heating autonomy and stable seasonal operation matter.
Price
from
lei
up to
lei
Brand
Power, kW
Heating surface, m²
Loading type
Sorting:
Power, kW
26,0
Heating surface, m²
250
Loading type
Automatic
109 148 lei
96 264 lei
Power, kW
20,0
Heating surface, m²
200
Loading type
Automatic
113 344 lei
100 031 lei
Power, kW
25,0
Heating surface, m²
250
Loading type
Automatic
114 224 lei
100 740 lei
Power, kW
12,0
Heating surface, m²
120
109 120 lei
104 324 lei
Power, kW
25,0
Heating surface, m²
250
Loading type
Automatic
118 580 lei
104 588 lei
Power, kW
30,0
Heating surface, m²
300
Loading type
Automatic
119 152 lei
104 978 lei
Power, kW
16,0
Heating surface, m²
160
Loading type
Automatic
113 344 lei
106 256 lei
Power, kW
20,0
Heating surface, m²
200
Loading type
Automatic
118 580 lei
110 563 lei
Power, kW
30,0
Heating surface, m²
300
Loading type
Automatic
125 356 lei
110 587 lei
Power, kW
40,0
Heating surface, m²
400
Loading type
Automatic
139 700 lei
110 919 lei
Power, kW
25,0
Heating surface, m²
250
Loading type
Automatic
126 500 lei
111 644 lei
Power, kW
24,0
Heating surface, m²
240
Loading type
Automatic
125 356 lei
113 989 lei
Power, kW
30,0
Heating surface, m²
300
Loading type
Automatic
129 800 lei
114 550 lei
Power, kW
35,0
Heating surface, m²
350
Loading type
Automatic
131 890 lei
116 381 lei
prod installation It is possible to order with installation
Solid fuel boiler Stalmark Eko Silver II 24Kw + Fan
Power, kW
24,0
Heating surface, m²
240
Loading type
Automatic
130 309 lei
118 463 lei
Power, kW
40,0
Heating surface, m²
400
Loading type
Automatic
136 730 lei
120 543 lei
Shown from 96 by 112 from 117 results

Solid fuel boilers are selected for houses with long winter cycles, for workshops and storage sites that need autonomous heating, and for commercial properties where gas dependency should be minimized. In Chisinau and across Moldova, effective selection starts from real heat loss, available fuel format, and actual boiler room constraints.

Before installation, teams validate chimney setup, ventilation, hydraulic layout, safety clearances, and service access. Wrong sizing or wrong setup often results in unstable heating and higher fuel consumption during peak season.

The practical workflow is load calculation, installation validation, fitting, startup checks, and maintenance planning.

 

When this category is the right fit

This page is used for projects where heating autonomy is a priority and fuel logistics can be maintained throughout the cold season.

 

What drives model selection

Key factors are heat loss, fuel type, chimney parameters, buffer volume, and loading cycle profile. For intensive operation, service routine is planned from the beginning.

 

Installation, startup, and stable operation

Before works begin, connection scheme and safety nodes are fixed, then startup is tested in real operating modes. Service terms are aligned at project confirmation stage.

 

What else matters in selection

For parent-level comparison across boiler formats, teams usually start from boilers. Where stable gas supply exists, they compare gas boilers for automated daily control. If electrical infrastructure is suitable, they also assess electric boilers as compact alternatives. For turnkey rollout, execution is coordinated through boiler installation with startup verification.

 

Frequently asked questions

What sites are solid fuel boilers suitable for?
For houses and commercial sites where heating autonomy is required through the season.

What is checked before installation?
Heat loss, chimney and ventilation setup, hydraulics, safety clearances, and service access.

Can installation and startup be delivered in one project?
Yes, selection, fitting, and commissioning can be coordinated in one workflow.

How can fuel overuse risk be reduced?
By accurate load-based sizing and operating-profile setup based on real usage.

Is service available after startup?
Yes, service terms are fixed when project conditions are confirmed.