We sell, deliver and install climate control equipment throughout the Republic of Moldova

Heat pumps

Air-to-water solutions for heating and hot water, selected by real operating conditions.
Price
from
lei
up to
lei
Brand
Room area, m²
Voltage, V
Type
Thermal power, KW
Heating electricity consumption, kW
Sorting:
Room area, m²
120-140
Voltage, V
220
Thermal power, KW
12,0
103 700 lei
Room area, m²
140-160
Voltage, V
220
Thermal power, KW
14,0
105 400 lei
Room area, m²
150-180
Voltage, V
220
Thermal power, KW
16,0
107 100 lei
Room area, m²
120-140
Voltage, V
380
Thermal power, KW
12,0
107 100 lei
Room area, m²
140-160
Voltage, V
380
Thermal power, KW
14,0
108 800 lei
Room area, m²
150-180
Voltage, V
380
Thermal power, KW
16,0
110 500 lei
Room area, m²
60-70
Voltage, V
220
Thermal power, KW
6,0
144 500 lei
Room area, m²
80-100
Voltage, V
220
Thermal power, KW
8,0
158 100 lei
Room area, m²
100-120
Voltage, V
220
Thermal power, KW
10,0
162 350 lei
Shown from 16 by 25 from 25 results

Heat pumps are selected for houses with full-season heating, offices with extended daily operation, and commercial sites where systems run 8-12 hours per day. In Chisinau and across Moldova, performance depends on real heat-loss calculation, operating profile, and existing hydronic layout.

Before installation, teams check outdoor-unit placement, accepted noise level, hydraulic configuration, drainage, and electrical supply. Wrong sizing or supply-temperature mismatch can cause higher consumption and unstable winter operation.

Work is structured in clear stages: load-based sizing, installation verification, fitting, startup checks, and service-term alignment.

 

How output is selected for each property type

Sizing is based on heat loss, insulation level, and DHW usage profile, not on floor area alone. For daily operation, thermal stability and shoulder-season efficiency are prioritized.

 

Checks before installation and startup

Before works begin, connection points, route, drainage, and compatibility with existing circuits are validated. After fitting, startup is performed with mode verification to reduce overload and follow-up interventions.

 

Operation and continuity service

Stable results depend on correct baseline settings, periodic checks, and planned maintenance. This lowers unplanned downtime risk and keeps seasonal costs more predictable.

 

Related categories

For projects that combine heating with climate control, planning is often aligned in ventilation and air conditioning. In suspended-ceiling offices, teams sometimes compare integration with cassette air conditioners for airflow distribution strategy. For zone-based control in separate rooms, many users also review wall-mounted split systems alongside heating design. Where lower wall placement is required in auxiliary zones, console air conditioners can be considered.

 

Frequently asked questions

How is output selected for a house?
Output is selected from heat loss, insulation, area, and DHW usage profile.

What is checked before installation?
Unit placement, connection scheme, drainage, electrical conditions, and circuit compatibility.

Can a heat pump be integrated with an existing heating system?
Yes, after hydraulic and temperature-regime compatibility checks.

Can installation and startup be included with equipment supply?
Yes, delivery, fitting, and commissioning can be coordinated in one workflow.

Is post-launch service available?
Yes, service terms are fixed during work confirmation.