We sell, deliver and install climate control equipment throughout the Republic of Moldova

Semi-industrial duct air conditioners

Concealed HVAC solutions for sites with sustained load and strict airflow-distribution requirements.
Price
from
lei
up to
lei
Brand
Room area, m²
Power, BTU
Compressor
Heating to, °C
Sorting:
Room area, m²
100
Power, BTU
32000
Compressor
Inverter
99 756 lei
prod installation It is possible to order with installation
Duct High ESP HAIER AD160S2SM3FA/1U160S2SP1FB
Room area, m²
100
Power, BTU
48000
Compressor
Inverter
102 521 lei
Room area, m²
250
Power, BTU
85000
Compressor
Inverter
105 400 lei
prod installation It is possible to order with installation
Duct High ESP HAIER ADH200H1ERG/1UH200W1ERK
Room area, m²
160
Power, BTU
60000
Compressor
Inverter
115 200 lei
Duct High ESP HAIER ADH250H1ERG/1UH250W1ERK
Room area, m²
230
Power, BTU
80000
Compressor
Inverter
121 200 lei
Room area, m²
125
Power, BTU
42000
Compressor
Inverter
122 380 lei
Room area, m²
140
Power, BTU
48000
Compressor
Inverter
141 856 lei
Room area, m²
300
Power, BTU
102000
Compressor
Inverter
147 900 lei
Room area, m²
400
Compressor
Inverter
195 500 lei
Room area, m²
600
Compressor
Inverter
273 700 lei
Shown from 32 by 42 from 42 results

Semi-industrial duct air conditioners are selected for multi-zone offices, commercial properties with constant traffic, and sites operating 8-12 hours per day. In Chisinau and across Moldova, this format is used when hidden installation and controlled airflow distribution are required.

Before selection, teams verify static pressure, route length, duct-network layout, ceiling constraints, noise limits, and service access. Wrong configuration often causes insufficient airflow, uneven temperature control, and repeated installation work.

A reliable process includes load calculation, installation validation, fitting, startup checks, and service planning.

 

When duct-based semi-industrial layout is optimal

This category fits properties where air must be distributed across multiple zones while keeping equipment visually hidden. In commercial operation, stability during peak hours is a key decision factor.

 

Parameters that define final configuration

Final setup depends on thermal load, property geometry, duct-network resistance, and duty cycle. For extended daily runtime, balance between performance and maintainability is essential.

 

Installation, startup, and operational stability

Before works begin, mounting points, route, drainage, and electrical baseline are fixed, then startup is performed with mode checks. After launch, service intervals are aligned for predictable operation.

 

What else matters in selection

For low-ceiling projects, teams often compare slim duct air conditioners as a compact alternative. For broad commercial category alignment, users review semi-industrial commercial air conditioners. In elongated zones, some projects evaluate floor-to-ceiling air conditioners for directional airflow control. For full execution workflow, stages are coordinated via commercial air conditioner installation.

 

Frequently asked questions

What properties are semi-industrial duct systems suitable for?
They are suitable for offices, commercial sites, and multi-zone objects with high daily load.

What is checked before installation?
Static pressure, route, drainage, duct network, ceiling limits, and service access.

Can installation and startup be included in one project?
Yes, selection, fitting, and commissioning can be coordinated in one workflow.

How can uneven airflow distribution risk be reduced?
By correct duct-network calculation and proper unit sizing for real object load.

Is post-launch service available?
Yes, service and maintenance terms are fixed during project confirmation.