We sell, deliver and install climate control equipment throughout the Republic of Moldova

Pipes, grilles and fittings for ventilation

Components for airtight installation and stable airflow in residential and commercial projects.
Price
from
lei
up to
lei
Brand
Sorting:
303 lei
Set of filters for NEOVENT KNV LUX 300 (2 pcs.)
410 lei
Set of filters for NEOVENT KNV LUX 520 (2 pcs.)
438 lei
Set of filters for NEOVENT KNV LUX 840 (2 pcs.)
465 lei
563 lei
Air filter Heatpex ARIA VITALE M5 puro iso epm10 50%
604 lei
Air filter Heatpex ARIA VITALE F7 puro iso epm1 70% (f7)
672 lei
Air filter Heatpex ARIA VITALE M5 puro carbon
807 lei
930 lei
Set of filters OSTBERG HERU 100 T EC (ePM1 50%)
1 164 lei
Set of filters OSTBERG HERU 100 S EC (ePM1 65%)
1 176 lei
Set of filters for NEOVENT KNP PERFECT 1000 (4 pcs.) G4
1 210 lei
1 214 lei
Set of filters OSTBERG HERU 160 S EC (ePM1 65%)
1 260 lei
Set of filters OSTBERG HERU 160 T EC (ePM1 50%)
1 326 lei
Set of filters OSTBERG HERU 200-300 S EC (ePM1 65%)
1 954 lei
Shown from 1 by 16 from 20 results

Pipes, grilles and fittings for ventilation are selected for home duct upgrades, offices with constant occupancy, and commercial sites where the system runs 8-12 hours per day. In Chisinau and across Moldova, correct component selection directly affects airtightness, noise level and stable airflow.

Before ordering, teams verify duct diameter and material, connection type, route resistance and mounting limits. Wrong selection often causes air leakage, extra noise and repeated site work.

The practical flow includes parameter check, compatible component selection, delivery, installation and post-startup control.

 

How to assemble a set without rework

For stable operation, the system should be assembled by the real project layout, not by a generic kit. Priority goes to diameter match, joint type and the operating profile of the property.

 

What defines connection reliability

Results depend on material quality, part geometry, fixing quality and service access. For continuously loaded sites, vibration, acoustics and maintenance access after launch also matter.

 

Delivery, installation and ongoing service

Before dispatch, compatibility and installation scope are confirmed, then airtightness and operating mode are checked after installation. This process reduces air-loss risk and speeds up daily operation launch.

 

What else matters in selection

For overall system planning, teams usually start from ventilation to define the right format for the property. If complete equipment is required, parameters are compared in ventilation units against airflow demand. For turnkey projects, delivery and field work are coordinated via installation of air conditioning and ventilation systems with on-site verification. When thermal control is part of the project, planning is extended through ventilation and air conditioning to keep temperature and airflow balanced.

 

Frequently asked questions

What projects is this category suitable for?
For residential and commercial ventilation systems with different duct configurations.

What is checked before ordering?
Diameter, material, connection type, route layout and compatibility with the existing network.

Can delivery and installation be coordinated together?
Yes, delivery and installation works can be integrated into one workflow.

How can air-leak risk in joints be reduced?
By correct fitting selection, proper geometry and airtightness checks during installation.

Is service available after installation?
Yes, inspection and support terms are fixed when works are confirmed.