Turnkey heating boiler installation in Chișinău and throughout Moldova with up to 5 years warranty

Turnkey gas, electric, and solid fuel boilers—official installation, proper piping, and safe initial startup in 1–3 days.
Request a booking or a quote

What heating boilers do we install?

Gas Boilers — the optimal solution for properties connected to the gas network
Gas Boilers — the optimal solution for properties connected to the gas network

We install wall-mounted and floor-standing models ranging from 18 to 60 kW for apartments, private homes, and commercial spaces. Capacity is calculated based on building heat loss, reducing gas overconsumption by up to 20% during the heating season and preventing heat exchanger overheating. We handle connection, piping, automation setup, and initial commissioning with mandatory pressure and draft checks.

Solid Fuel Boilers — autonomy and independence from gas
Solid Fuel Boilers — autonomy and independence from gas

We install wood, coal, and pellet boilers for private homes and industrial facilities. Proper integration with a buffer tank increases system efficiency and reduces fuel consumption by up to 25% compared to direct connection. A correctly configured system protects the heat exchanger from overheating and extends equipment lifespan.

Electric Boilers — solution for properties without gas supply
Electric Boilers — solution for properties without gas supply

Electric boilers from 6 to 24 kW are suitable for apartments, small houses, and backup heating systems. Installation considers available electrical capacity and network load to prevent wiring overheating and circuit breaker trips during winter. This ensures safe and stable performance under peak loads.

Heat Pumps — next-generation energy-efficient heating
Heat Pumps — next-generation energy-efficient heating

We install air-to-water and ground-to-water heat pumps for residential and commercial properties. With a coefficient of performance (COP) of 3–4, the system produces 3–4 kW of heat for every 1 kW of electricity consumed, reducing heating costs by 50–60% compared to an electric boiler. We perform heat loss calculations, capacity selection, hydraulic module installation, and full system setup to ensure stable winter operation.

How to make the right choice without mistakes?

Quick boiler power calculation formula:

 

1 kW of power  →  10 m² of heated area

 

If the boiler is also needed for DHW  →  add 30% to the required power

What is included in professional boiler installation?

1
Technical Inspection and System Preparation
We assess the area and heat loss, check pipe diameter, gas pressure, or electrical network parameters. When replacing a unit, we carefully dismantle the old boiler and prepare the system for new equipment installation. Errors at this stage can lead to up to 25% excess fuel consumption and accelerated heat exchanger wear.
2
Boiler Installation and System Piping
We install the boiler perfectly level, maintaining required clearances from walls and ceiling. We connect supply and return lines, install the safety group, expansion tank, and shut-off valves. Incorrect piping causes pressure fluctuations and overload of the circulation pump.
3
Connection to Energy Source and Chimney
We connect the system to the gas line or electrical network with mandatory leak and safety checks. We install the chimney according to required diameter and draft to ensure stable combustion and proper exhaust gas removal. Violations at this stage reduce efficiency and may cause emergency shutdown.
4
Startup, Adjustment, and Safety Control
We fill the system with heat transfer fluid, remove air, and check pressure. A test startup is performed, automation is configured, and equipment stability is monitored. Only after verifying temperature, tightness, and safety modes is the system considered ready for operation.

Requirements and documentation for boiler installation

Boiler installation involves not only connecting the equipment but also complying with construction and gas regulations. Failure to meet these requirements may result in connection refusal, fines, or emergency system shutdown.

 

Main installation requirements:

 

  • Proper supply and exhaust ventilation
  • Sufficient room volume (according to boiler capacity)
  • Functional grounding (for electric and gas models with automation)
  • Dedicated power line with circuit breaker protection
  • Proper chimney diameter and stable draft
  • Approved project documentation — mandatory for gas boilers

Compliance with these requirements ensures stable equipment operation, proper combustion, and safe usage.

 

Documentation After Installation

 

Upon completion of the work, we provide:

  • Warranty certificate for the installed equipment
  • Service completion report

These documents allow official commissioning of the system and preserve the manufacturer’s warranty.

Frequently Asked Questions

Frequently Asked Questions
How much does boiler installation cost in Moldova? chevron down

The installation cost depends on the type of equipment (gas, electric, solid fuel), its capacity, and the complexity of the piping. On average, installation starts from 2500–4000 MDL. The exact price is determined after on-site inspection and connection scheme calculation.

What is included in turnkey boiler installation? chevron down

Installation includes mounting the equipment, connecting it to the heating system, completing the piping, connecting to the energy source (gas or electricity), checking the chimney (if required), filling the system with heating fluid, and initial startup with automation adjustment.

How long does boiler installation take? chevron down

Standard installation takes 1–2 working days. If old equipment removal, pipe modifications, or chimney installation is required, the timeframe may be extended. Rushing the installation increases the risk of leaks and unstable operation.

Is a project required for boiler installation? chevron down

A project is required when connecting to the gas network or modifying an existing heating system. For electric and solid fuel boilers, project requirements depend on capacity and property conditions. Exact requirements are determined after technical inspection.

Can an old boiler be replaced without modifying the system? chevron down

In some cases, yes. However, most replacements require piping adjustments, pressure checks, and compatibility verification with the new unit’s capacity. Installing without recalculating parameters may result in excessive energy consumption and reduced equipment lifespan.

What are the room requirements for boiler installation? chevron down

Requirements depend on the boiler type but generally include proper ventilation, sufficient room volume, chimney availability (if required), grounding, and acceptable electrical load. Failure to meet these conditions may result in connection refusal or unstable system operation.

Is chimney installation mandatory? chevron down

A chimney is required for boilers with open or closed combustion chambers and for solid fuel models. Electric boilers do not require a flue system. The type of exhaust system is determined during the calculation stage.

What documents are provided after boiler installation? chevron down

Upon completion, a service completion report and warranty certificate are issued.

We work in all regions of Moldova

  • Anenii Noi
  • Balti
  • Basarabeasca
  • Bender
  • Biruinta
  • Briceni
  • Bucovat
  • Cahul
  • Cainari
  • Calarasi
  • Camenca
  • Cantemir
  • Causeni
  • Ceadir Lunga
  • Chisinau
  • Cimislia
  • Codru
  • Comrat
  • Cornesti
  • Costesti
  • Crasnoe
  • Cricova
  • Criuleni
  • Cupcini
  • Dnestrovsc
  • Donduseni
  • Drochia
  • Dubasari
  • Durlesti
  • Edinet
  • Falesti
  • Floresti
  • Frunza
  • Ghindesti
  • Glodeni
  • Grigoriopol
  • Hincesti
  • Ialoveni
  • Iargara
  • Leova
  • Lipcani
  • Maiac
  • Marculesti
  • Nisporeni
  • Ocnita
  • Orhei
  • Otaci
  • Rezina
  • Ribnita
  • Riscani
  • Singera
  • Singerei
  • Slobozia
  • Soldanesti
  • Soroca
  • Stefan Voda
  • Straseni
  • Taraclia
  • Telenesti
  • Tiraspol
  • Tvardita
  • Ungheni
  • Vadul lui Voda
  • Vatra
  • Vulcanesti
country map
Request a booking or a quote
Call us or leave your phone number — we will contact you shortly
+373 69 83 44 42