We sell, deliver and install climate control equipment throughout the Republic of Moldova
Product code: 63973

Refrigerant refill service for air conditioners with a capacity of 9000-24000 BTU

Power, BTU: 9000
1
1 170 mdl
1 170 mdl
6 month
= 195.00 Lei/month
0% OVERPAYMENT
Choose your installation team arrow down
Ghennadi and Vadim
Installation crew "Ghennadi and Vadim"
Product Description

A 9000 BTU split system is commonly used in bedrooms, children’s rooms, and small offices. However, even the most reliable equipment can lose efficiency over time.
The most common reason is a drop in refrigerant (freon) level, which often goes unnoticed.

Why freon is lost:

Micro-leaks at joints (fittings, connectors);

Poor installation or unsealed piping;

Natural evaporation during high seasonal load;

Damage to piping or outdoor unit vibration.

Symptoms of low refrigerant:

Weak cooling even at max settings;

Frozen evaporator or water dripping inside;

Increased noise or vibrations;

Unit shuts off after a few minutes;

Higher energy consumption.

What our service includes:

Full system diagnostics – pressure, temperature, current check, and visual inspection of lines and units;

Leak detection – using an electronic detector or soap solution;

Vacuuming – to remove air and moisture for correct system operation;

Precise refrigerant charge – based on pipe length and manufacturer specs;

System test – input/output temperature readings and compressor stability check.

Why choose Eurosanteh:

We use professional-grade filling stations and precision scales;

We work with all refrigerants: R22, R410A, R32;

We provide an official warranty for our work;

We offer same-day, turnkey service.

Recharging isn’t just “topping up freon” — it’s a complete procedure that restores your system’s factory performance.
We monitor every step so your 9000 BTU unit can deliver reliable cooling and quiet operation again.

Product characteristics arrow down
Air conditioner type: Split-Sistem
Type of Service: Freon filling
Power, BTU: 9000
Executors: Engineers of Eurosanteh company
Execution Duration, hours: 2-3
Please clarify the specifications with the managers, as they may differ from the actual ones