Dismantling of the outdoor unit of a 42000 BTU floor-ceiling type air conditioner



42000 BTU equipment is heavy-duty climate control technology designed for shopping centers, warehouses, banquet halls, and other large-scale facilities. Dismantling the outdoor unit of such a system requires advanced technical training, real-world experience, and strict safety compliance.
EuroSanteh provides a full-service dismantling solution — from diagnostics to equipment removal — anywhere in Moldova.
What’s included in a 42000 BTU dismantling with EuroSanteh:
▪️ Professional dismantling of large-scale equipment
We know exactly how to handle bulky units. We begin with inspection, disconnect power, recover refrigerant, disconnect all systems, and remove the unit from its mounts.
▪️ Technical supervision and full safety compliance
Each stage is overseen by an experienced engineer. We use lifting equipment, safety gear, and secure mounts — safety and equipment protection are top priorities.
▪️ Transparent pricing for complete service
No hidden fees or fine-print conditions. The price is calculated in advance, stated in the contract, and remains unchanged.
▪️ Packaging and transport preparation
If the unit will be reused, we pack it according to transport standards: refrigerant line sealing, protection of electrical contacts, filters, and casing.
▪️ Nationwide service coverage
Chișinău, Bălți, Hîncești, Drochia, Cahul — we work throughout all of Moldova. Distance is never a problem for us.
▪️ Cleanup and façade restoration
Dismantling isn’t just about removal — we also finalize the job properly: clean up, seal openings, and leave the site in order.
EuroSanteh — experts in dismantling HVAC systems of any complexity.
Let us handle your 42000 BTU dismantling — and enjoy guaranteed results with zero hassle.
Air conditioner type: | Floor-ceiling |
Power, BTU: | 42000 |
Type of Service: | Equipment dismantling |
Unit Type: | Outdoor unit |
Post-installation Support: | Included in the price |
Executors: | Engineers of Eurosanteh company |
Execution Duration, hours: | 1,30-2 |