Ventilation units
Ventilation units are selected for apartments with humidity issues, offices with constant occupancy, and commercial sites operating 8-12 hours per day. In Chisinau and across Moldova, the right setup starts from real airflow demand rather than a generic template.
Before selection, teams verify required airflow, ceiling constraints, duct layout, noise limits, placement conditions, and connection baseline. Incorrect calculation may cause weak ventilation, higher consumption, and repeated works.
A practical workflow includes calculation, installation checks, fitting, startup, and service planning.
When a dedicated unit is needed
This category is relevant when natural ventilation cannot maintain comfort and air-quality targets under real occupancy. For extended operation, stability and controllable airflow are essential.
Selection parameters that matter
Final choice depends on airflow target, duct-network resistance, acoustic limits, and usage profile. For predictable operation, service access and filter maintenance should be planned in advance.
Installation, startup, and maintenance
Before works begin, unit position, route, electrical baseline, and drainage are fixed, then startup is completed with mode checks. After launch, maintenance intervals are aligned for stable long-term performance.
Related sections
For overall scenario selection, users often start from ventilation. For routing and component matching, ducts and fittings for ventilation is a practical next step. For full implementation projects, stages are coordinated via air conditioning and ventilation installation. If cooling integration is required, planning is often aligned through ventilation and air conditioning.
Frequently asked questions
What property types are ventilation units suitable for?
They are suitable for apartments, houses, offices, and commercial sites with steady airflow demand.
What is checked before installation?
Airflow target, duct layout, noise limits, placement conditions, and service access.
Can installation and startup be included in one project?
Yes, selection, fitting, and commissioning can be coordinated in one workflow.
How can insufficient ventilation risk be reduced?
By correct airflow calculation and matching the unit to real duct-network resistance.
Is post-launch service available?
Yes, service and maintenance terms are fixed during project confirmation.