We sell, deliver and install climate control equipment throughout the Republic of Moldova
Product code: 44401

Dismantling of the outdoor unit of a 30000 BTU ducted air conditioner

1
1 500 mdl
Choose your installation team arrow down
Eduard and Lameh
Installation crew "Eduard and Lameh"
Radion and Petru
Installation crew "Radion and Petru"
Victor and Eugeniu
Installation crew "Victor and Eugeniu"
Product Description

30000 BTU ducted air conditioners are installed in spacious homes, salons, offices with multiple work zones, and other large spaces where power and stability are essential. The outdoor units of such systems are larger, heavier, and feature more complex connection layouts. Their dismantling requires experience, compliance with regulations, and specialized preparation.

What the dismantling process includes:

▪️ disconnection from power supply, automation, and remote control systems (if applicable);
▪️ refrigerant evacuation and proper ecological disposal;
▪️ disconnection of copper lines, drainage, and signal wiring;
▪️ careful removal of the unit from facades or rooftops;
▪️ safe lowering of the equipment and assistance with disposal (upon request).

Why Eurosanteh is the right choice:

☑️ Complex dismantling is our specialty — over 10 years in the HVAC engineering industry;
☑️ Modern equipment and safety standards — zero risk to people or property;
☑️ High-quality service — fast, clean work without damage to facades or finishes;
☑️ Clear estimate and fixed price — you know exactly what the job will cost;
☑️ Official warranty and documentation — full paperwork and after-service support.

By choosing Eurosanteh for dismantling your 30000 BTU outdoor unit, you get a partner who works professionally, precisely, and without added stress. We handle everything — from your first call to the final service report.

Product characteristics arrow down
Air conditioner type: Duct
Power, BTU: 30000
Type of Service: Equipment dismantling
Unit Type: Outdoor unit
Post-installation Support: Included in the price
Executors: Engineers of Eurosanteh company
Execution Duration, hours: 1,30-2
Please clarify the specifications with the managers, as they may differ from the actual ones