We sell, deliver and install climate control equipment throughout the Republic of Moldova
Product code: 44399

Dismantling of the outdoor unit of a 24000 BTU ducted air conditioner

1
1 200 mdl
Choose your installation team arrow down
Eduard and Lameh
Installation crew "Eduard and Lameh"
Radion and Petru
Installation crew "Radion and Petru"
Victor and Eugeniu
Installation crew "Victor and Eugeniu"
Product Description

Outdoor units of 24000 BTU ducted air conditioners serve large apartments, stores, offices, server rooms, and other spaces where a stable indoor climate is critical. These units are known for their high performance and considerable size, and dismantling them requires more than just tools — it takes a coordinated team of professionals. Especially when the unit is installed on the façade of a tall building or on the rooftop.

The dismantling process includes:

▪️ safe disconnection from the power supply and automation systems;
▪️ collection and environmentally compliant disposal of refrigerant;
▪️ disconnection of refrigerant and drainage lines;
▪️ careful removal from the mounting platform;
▪️ lowering and removal of the equipment, with optional disposal upon request.

Why trust Eurosanteh:

☑️ Specialized in high-power equipment — we handle dismantling of any complexity;
☑️ High-altitude work without risk — certified industrial climbers and installation technicians;
☑️ Safe and clean process — no façade damage, no refrigerant leakage;
☑️ Transparent pricing — fixed cost agreed before the job starts;
☑️ Guaranteed results — official documentation and full support at every stage.

With Eurosanteh, dismantling a 24000 BTU unit is not a gamble — it’s a well-planned, controlled operation. We eliminate unnecessary risks and save you time. Work with professionals — and enjoy flawless results.

Product characteristics arrow down
Air conditioner type: Duct
Power, BTU: 24000
Type of Service: Equipment dismantling
Unit Type: Outdoor unit
Post-installation Support: Included in the price
Executors: Engineers of Eurosanteh company
Execution Duration, hours: 1,30-2
Please clarify the specifications with the managers, as they may differ from the actual ones