Boiler installation in Chișinău within 1 day, with up to 24-month warranty
What is included in professional boiler installation
1. Wall inspection and secure mounting
Before installation, we assess the wall type and load-bearing capacity.
An 80–100 liter boiler weighs up to 140 kg when filled with water — weak fasteners may pull out over time.
We use reinforced anchors, level the unit precisely, and check for secure fixation without play.
Incorrect installation geometry increases stress on the tank and connections.
2. Water connection with leak protection
We connect cold and hot water through shut-off valves.
Removable fittings are installed for future maintenance.
After installation, we perform a pressure test at 3–6 bar.
Any micro-leak is detected immediately, not a week later.
3. Installation of the safety valve
When heated, water expands and pressure inside the tank increases.
Without a safety valve, internal tank stress rises.
The valve automatically releases excess pressure and protects the tank from premature wear.
4. Electrical system check and safe connection
A 1.5–2.5 kW boiler places a significant load on the electrical line.
We check cable cross-section, circuit breaker rating, and grounding availability.
Connection is carried out with correct phase alignment.
Lack of grounding or an undersized line is a common cause of breaker trips and wiring overheating.
5. Initial startup and performance check
Before switching on, we fully fill the tank with water — dry operation of the heating element leads to burnout.
We verify temperature rise, thermostat operation, and absence of contact overheating.
The job is handed over only after a complete inspection.
No hot water is an inconvenience. A leaking boiler is already a serious problem.
How much does boiler installation cost?
Why customers trust us with boiler installation
✔ Over 200 installations in Chișinău and surrounding areas
Practical experience is not theory.
We have installed boilers in older apartments with aluminum wiring, in new buildings with high water pressure, and in private homes with autonomous systems.
Different conditions — different technical solutions. Mistakes here are costly.
✔ We follow technical standards, not “whatever is faster”
Every boiler is connected through a safety valve and we check working pressure.
Before startup, we fully fill the tank with water — dry operation drastically shortens the heating element’s lifespan.
Safety is not optional. It is a mandatory step.
✔ Fixed price before work begins
The cost is confirmed after clarifying conditions and does not change during the process.
You know in advance what you are paying for — no “small extra charges” at the end.
Transparency reduces the risk of conflict and distrust.
✔ Up to 24-month installation warranty
If a problem occurs due to our fault — we fix it free of charge.
Warranty obligations are documented in the work order.
This holds the contractor accountable more than any promise.
✔ Urgent service in Chișinău
In most cases, we arrive within 2–4 hours.
When a boiler leaks or the breaker trips, waiting several days means risk.
Fast response reduces the likelihood of major damage.
How we work
Brands we work with
Frequently asked questions
Standard installation takes 1.5–3 hours. This includes mounting brackets, connection to the water supply, installation of the safety valve, and load testing. Urgent service is available on the same day.
Technically yes, but without proper grounding, a safety valve, or correct electrical connection, the risk of leaks and wiring overheating increases. Most accidents are caused by installation errors rather than equipment quality.
A 1.5–2.5 kW boiler places significant load on the electrical line. In older apartments, a dedicated line with a circuit breaker and grounding is recommended. This reduces the risk of breaker trips and cable overheating.
Yes. When heated, water expands and pressure inside the tank increases. The safety valve releases excess pressure and protects the inner tank from premature wear.
For 1–2 people, 50 liters is usually sufficient; for a family of 3–4 people, 80–100 liters is recommended. The choice depends on the number of water outlets and the frequency of hot water use.
It is recommended to inspect the heating element and descale it every 1–2 years. In areas with hard water, this extends equipment lifespan and reduces electricity consumption.
The most common cause is a worn safety valve or loss of tightness in the connections. In case of continuous leakage, stop using the unit and call a technician to prevent flooding.
Our installers
We provide boiler installation services throughout Moldova
- Anenii Noi
- Balti
- Basarabeasca
- Bender
- Biruinta
- Briceni
- Bucovat
- Cahul
- Cainari
- Calarasi
- Camenca
- Cantemir
- Causeni
- Ceadir Lunga
- Chisinau
- Cimislia
- Codru
- Comrat
- Cornesti
- Costesti
- Crasnoe
- Cricova
- Criuleni
- Cupcini
- Dnestrovsc
- Donduseni
- Drochia
- Dubasari
- Durlesti
- Edinet
- Falesti
- Floresti
- Frunza
- Ghindesti
- Glodeni
- Grigoriopol
- Hincesti
- Ialoveni
- Iargara
- Leova
- Lipcani
- Maiac
- Marculesti
- Nisporeni
- Ocnita
- Orhei
- Otaci
- Rezina
- Ribnita
- Riscani
- Singera
- Singerei
- Slobozia
- Soldanesti
- Soroca
- Stefan Voda
- Straseni
- Taraclia
- Telenesti
- Tiraspol
- Tvardita
- Ungheni
- Vadul lui Voda
- Vatra
- Vulcanesti